Case Study Leisure

Supporting Faster Refurbishment Projects With VinyPlus Duo

Eltherington Leisure | Twin Profile PVC Cladding System

Sector

Leisure

Application

Holiday Park Refurbishment Programme

System

VinyPlus Duo

Product Type

Twin Profile PVC Cladding System

When a holiday park operator began a large-scale refurbishment programme across older accommodation units, they required a cladding system capable of modernising the appearance of the homes while minimising disruption during occupied park periods.

The priority was speed, consistency and long-term reliability.

Working alongside both the park operator and manufacturing customer, Eltherington Leisure supplied VinyPlus Duo as the ideal refurbishment solution.

Its practical profile design and efficient installation process allowed the refurbishment works to progress quickly while maintaining a clean, consistent appearance across the park.

The system also helped eliminate many of the maintenance concerns associated with older external finishes, providing a more durable and weather-resistant solution better suited to exposed leisure environments.

For the customer, VinyPlus Duo delivered an efficient and cost-effective route to extending the lifespan and appearance of existing accommodation stock without the need for major structural alterations.

Vinyplus oak concrete modular unit
Vinyplus oak concrete cladding
Vinyplus oak concrete holiday home
Vinyplus oak concrete cladding detail